По 19 месеци во бегство, Бајрами се предаде на Блаце во 5:35 наутро: истиот премин, истото рано утро како и Груби
10.09.2026
10.09.2026
10.09.2026
10.09.2026
10.09.2026
10.09.2026
10.09.2026
10.09.2026
09.09.2026
08.09.2026
10.09.2026
10.09.2026
09.09.2026
10.09.2026
10.09.2026
10.09.2026
10.09.2026
08.09.2026
07.09.2026
10.09.2026
10.09.2026
10.09.2026
10.09.2026
10.09.2026
09.09.2026
09.03.2026
27.02.2026
19.02.2026
23.04.2026
23.04.2026
12.04.2026
The bridge over Markova Reka at the entrance to Dračevo is being rehabilitated, and residents will have to wait until early September. That is the timeline in the contract between the Public Enterprise for State Roads and the contractor „Sintek Inženering” from the village of Brazda.
The work costs 4,619,800 denars excluding VAT, or around 75,000 euros, funded from the public enterprise's budget. Supervision is carried out by „EOS E.E.” from Skopje.
The work covers the bridge's upper structure. The existing expansion joints, drains, asphalt, railing and pavements are being removed, then a new concrete slab, waterproofing, asphalt, new pavements and a new railing are being installed. During the works traffic is managed with light signals, and vehicles alternate through a single lane.
The head of the state roads enterprise Koce Trajanovski and Kisela Voda mayor Beti Stamenkoska-Trajkoska inspected the site and found that work is proceeding at pace, timed for the summer period when traffic is lighter.
That is a correct calculation. Fewer vehicles in August means fewer people stuck in a single lane. But the same calculation raises the other question: the bridge, as it stood before the works began, was in exceptionally poor condition - and it got to that state while the enterprise was managing traffic across it every single day.
The state roads enterprise says it looks after the maintenance of more than 1,100 bridges on state roads across the entire territory. Expansion joints, asphalt and other fastest-wearing elements need periodic replacement, they explain. Eleven hundred bridges is a figure that on its own explains why maintenance has to be a calendar and not a reaction. By the time a bridge reaches a condition where repair is urgent, it is no longer maintenance - it is rehabilitation, and that always costs more.
Dračevo residents are meanwhile going through traffic chaos also fuelled by the reconstruction of „Boris Trajkovski” boulevard. Two building sites on one route, in the same month. Somebody called that summer scheduling.
The latest 10 news from this category
Обилните врнежи ланската сезона го подигнаа езерото за 111 сантиметри. Тоа не го поништува фактот дека од 1984 наваму Преспа...
Општината вели дека договорот не значи припојување, преземање, поделба ниту статусна промена на клубот. Кога институција набројува што нема да...
По математика основно ниво имаат 32 отсто, по природни науки 36. Ниво 5 или 6 по природни науки не достигна...
Снимката ја објави дебарското риболовно друштво Трофта, МВР потоа најави дека бара идентитет. Прашањето не е само кој е човекот...
Инспекторатот утврдил потешки повреди, но што пишува во извештајот советниците не дознаа. Опозицијата тврди дека повредите се незапишан час во...
Градоначалникот Ѓорѓиевски им се заблагодари на работниците што ја поминале ноќта на терен. Нивниот труд е единствената ставка од целата...
Секој изминат километар на No Finish Line Skopje оди во помош за Детската болница Козле. Форматот ја отстранува пречката -...
Konjanovski's report is full of figures - 10 kilometres of streets, 220 parking spaces, 96 million for the cinema. But...
A monthly pass costs 1,850 denars, under 90 denars a day for the round trip. If rail is the fastest...
The emptiest is the Technical Faculty with 269 places, while two of its own programmes filled up in the first...
This site uses cookies - is that okay? Learn more
Be the first to know when Metla launches something new
Leave your email and we will write when there is a new guide or something new on Metla.